Electrical work contracted under C K ELECTRIC · CSLB Lic. #354550 (C-10) · Farmer Works Electric license in process
ServicesEV chargersFree toolsCode libraryWorkService areasAboutContact

Electrical work contracted under C K ELECTRIC · CSLB Lic. #354550 (C-10) · Farmer Works Electric license in process

NEC 440.3 · Homes · California rule

California: heat-pump-ready circuit at gas furnaces

In a new California one- or two-family home with a gas or propane furnace, the 2025 Energy Code requires a 240-volt, 30-amp-minimum circuit within 3 ft of the furnace and a reserved, marked double-pole breaker space for a future heat pump.

Diagram of a gas furnace with a 240V ready cover within 3 ft, a 240 V circuit rated 30 A min and a reserved double-pole panel space.
Applies to new homes with permits filed on or after Jan 1, 2026. Additions and alterations are not covered, and it is not required when electric or heat pump space heating is installed. Diagram: Farmer Works Electric, free to share under CC BY 4.0 · Download PNG · How to credit

What the code requires

The 2025 California Electrical Code adds section 440.3, which points to California Energy Code §150.0(t). It applies to each dwelling unit in new buildings with one or two dwellings when a gas or propane furnace serves the home. Other gas equipment does not trigger it.

The home needs a dedicated 240-volt branch circuit within 3 ft of the furnace, accessible with no obstructions, with conductors rated 30 A minimum. It ends at a blank cover identified as 240V ready. The main service panel needs a reserved double-pole breaker space permanently marked For Future 240V use.

No receptacle or breaker has to be installed at construction, and the circuit may not serve other appliances. All components must meet the California Electrical Code.

On the job

  • A cover without the 240V ready identification, or a panel space without the For Future 240V use marking, does not comply.
  • A circuit that ends more than 3 ft from the furnace does not comply.
  • The reserved space takes up a breaker position in the main panel; see 408.2 for how the reserved spaces add up in a new home.
Outdoor heat pump unit mounted beside a house with lap siding
Outdoor heat pump unit (representative stock photo).

Exceptions that matter

  • Applies only to newly constructed buildings. Additions and alterations are not covered.
  • Not required when electric or heat pump space heating is installed.
  • Applies to permit applications filed on or after Jan 1, 2026.

In California

For multifamily buildings, the 2025 Energy Code places the same 240-volt, 30-amp, 3 ft rule in §160.9(b), while the CEC text still cites an older subsection letter, so confirm with your building department.

Related sections

Where this comes from

0/300

Answers come from this library only and are written by AI. They can be wrong, so check the cited section and confirm with your building department.

San Clemente · South OC to North County San Diego

Send a photo. Get a real answer.

Text is fastest, and a photo quote is free. Call if it is urgent, if you smell something burning, or if a breaker will not reset.

Electrical work contracted under C K ELECTRIC · CSLB Lic. #354550 (C-10) · Farmer Works Electric license in process